Pueblo Industrial Storm Water Detention Pond
Project Summary
What was completed for the Pueblo Industrial Storm Water Detention Pond project?
Engineered construction of a 2.5-acre storm water runoff detention basin and drainage corridor for an industrial park expansion in Pueblo, Colorado.
Included mass retention basin excavation, reinforced concrete outlet weir structures, rip-rap energy dissipating channels, and 36-inch reinforced concrete storm sewer pipe tie-ins complying with municipal drainage regulations.
Included mass retention basin excavation, reinforced concrete outlet weir structures, rip-rap energy dissipating channels, and 36-inch reinforced concrete storm sewer pipe tie-ins complying with municipal drainage regulations.
Engineered construction of a 2.5-acre storm water runoff detention basin and drainage corridor for an industrial park expansion in Pueblo, Colorado.
Included mass retention basin excavation, reinforced concrete outlet weir structures, rip-rap energy dissipating channels, and 36-inch reinforced concrete storm sewer pipe tie-ins complying with municipal drainage regulations.
Included mass retention basin excavation, reinforced concrete outlet weir structures, rip-rap energy dissipating channels, and 36-inch reinforced concrete storm sewer pipe tie-ins complying with municipal drainage regulations.